基于Min-Max方法的混沌系统采样同步控制研究. 物理学报, 62(17): 170510-1-8, 2013.
Release time:2022-07-22 Hits:
Translation or Not:no
Pre One:
Permutation flow-shop scheduling problem to optimize a quadratic objective function. Engineering Optimization, 49(9): 1589-1603, 2017. SCI-2区
Next One:
The Consensus of Nonlinear Multi-agent System with Switching Topologies and Communication Failure. Journal of Intelligent and Fuzzy Systems, 30(2): 1199-1206, 2016.
