汪恭书
开通时间:..
最后更新时间:..
扫描访问手机版
点击次数:
第一作者:Wang, Gongshu
合写作者:Tang, Lixin
发表刊物:2008 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL TECHNOLOGY, VOLS 1-5
页面范围:1947-1951
是否译文:否
上一条:Decision support system for the batching problems of steelmaking and continuous-casting production
下一条:A branch-and-price algorithm to solve the molten iron allocation problem in iron and steel industry