徐建有
曾获荣誉:
开通时间:..
最后更新时间:..
扫描访问手机版
发布时间:2022-04-12 点击次数:
第一作者:Jan-Yee Kung
通讯作者:Chin-Chia Wu
合写作者:Jiahui Duan,Jianyou Xu,I-Hong Chung,Shuenn-Ren Cheng,Win-Chin Lin
发表刊物:Discrete Dynamics in Nature and Society
影响因子:0.973
论文类型:SCI检索
备注:Q4
是否译文:否
上一条:An iterated local search and tabu search for two-parallel machine scheduling problem to minimize the maximum total completion time
下一条:A two-machine flowshop scheduling problem with a job precedence constraint to minimize the total completion time