Language :
CN
牛大鹏
Home
Scientific Research
Research Field
Paper Publications
Patents
Published Books
Research Projects
Teaching Research
Teaching Resources
Teaching Information
Teaching Achievement
Awards and Honours
Enrollment Information
Student Information
My Album
Blog
MOBILE Version
Paper Publications
Current position:
Home
>
Scientific Research
>
Paper Publications
[1]Niu Dapeng, Yang Minghao, Jia Mingxing, Jin Hongli, Luo Gang. Performance Evaluation ofElevators Using a Novel Hierarchical Softmax Regression Model, Mechanical Systems and SignalProcessing, 2025, 228, 112429 (SCI检索,JCR Q1).
[2]Niu Dapeng, Guo Lei, Jia Mingxing. Operation Condition Assessment for Elevators UnderLimited High-Quality Label and Unbalanced Data Using Feature Alignment Encoder GAN, MechanicalSystems and Signal Processing, 2025, 229, 112497(SCI检索,JCR Q1).
[3]Guo Lei, Niu Dapeng*, ZhaoJiaxu, Jia Mingxing. Operation Condition Assessment for ElevatorsBased on Multi-Domain Generalization andAdaptation[J].IEEE/ASME Transactions on Mechatronics, 2025.(SCI检索,JCR Q1).
[4]Niu Dapeng, Lei Guangyang. Self-Healing Control of Abnormal Conditions for Fused Magnesium Furnace Based on Data Augmentation and Improved JITL[J]. Advanced Engineering Informatics, 2024, 61, 102477.(SCI检索,JCR Q1).
[5]Niu Dapeng, Song Dandan. Model-Based Robust Fault Diagnosis of IncipientITSC for PMSM in Elevator Traction System[J]. IEEE Transactions on Instrumentation and Measurement, 2023, 72, 3533512.(SCI检索,JCR Q1).
[6]Niu Dapeng, Lei Guangyang. Prediction of abnormal conditions for fused magnesium furnace based on improvedLSTM model and rule-based reasoning[J]. Measurement, 2023, 218, 113163.(SCI检索,JCR Q1).
[7]Guo Lei, Niu Dapeng*. Operation Condition Assessment for Elevators Based on Deep Siamese Network and T-S Semi-Supervision Model[J]. IEEE Transactions on Instrumentation and Measurement, 2024, 73, 7503013.(SCI检索,JCR Q1).
[8]Optimization control of hydrometallurgical leaching process based on IDE-MPC.Minerals Engineering.[JCR 一区].
[9]Operation performance evaluation of elevators based on condition monitoring and combination weighting method.Measurement,194.[JCR 一区].
[10]Niu Dapeng,Guo Lei , Bi Xiaolin , et al. Preventive maintenance period decision for elevator parts based on multi-objective optimization method[J]. Journal of Building Engineering, 2021..
total19 1/2
first
previous
next
last
Page