Pre One:S. J. Li, Q. Yang*, M. Geng, et al. Structural design and kinematic analysis of moving mechanism of insulator inspection robot. The 3rd IFToMM Symposium on Mechanism Design for Robotics, Aalborg, Denmark, 2-4 June 2015. Proceedings of the 3rd IFToMM Symposium on Mechanism Design for Robotics, MEDER 2015,33:239-247 (通讯作者) EI检索,EI:20154501494006
Next One:Cui-Ling Li, Qiang Yang*, Tie-Qiang Zhang et al. Broken Strands Repair Operation Metamorphic Mechanism of Extra-High-VoltageTransmission Lines. Proceeding of 2015 international conference on energy equipment science and engineering, 30-31 May 2015, Guangzhou China, 1881-1884. (通讯作者) EI检索,EI:20162402496078