![]()
-
-
王显鹏
(
教授
)
赞
-
教授
博士生导师
硕士生导师
- 主要任职:东北大学人工智能与大数据研究院副院长
- 其他任职:辽宁省兵器工业智能优化与控制重点实验室学术委员会主任
- 教师拼音名称:WangXianpeng
- 电子邮箱:c4d8f923795d32a3e8f5ba609062271c2ed2a75866c0e1679bec5541d1e1b3a403e83e5ba42d352a724654ea3496d0170062f2859023bfdf14782f4020e593e24118b9245c2ef09ec5ff5c0297f82bd15dd2110b867a738ea6ef27dba21f07c2b931b69139d6ef453bd9f63181fe4c6de85e50debf1d23dcf3584b7d43f525d6
- 所在单位:Northeastern University
- 职务:东北大学人工智能与大数据研究院副院长
- 学历:博士研究生毕业
- 性别:男
- 联系方式:wangxianpeng@ise.neu.edu.cn
- 学位:博士
- 在职信息:在职
- 毕业院校:东北大学
- 学科:
系统工程
- [61] Tang LX*, Wang XP. A two phase heuristic for the production scheduling of heavy plates in steel industry, IEEE Transactions on Control Systems Technology, 18(1): 104-117, 2010. (中科院二区).
- [62] Wang XP, Tang LX*. A hybrid metaheuristic for the prize-collecting single machine scheduling with sequence-dependent setup times, Computers & Operations Research, 37(9): 1624-1640, 2010. (中科院二区, JCR 1区).
- [63] Wang XP, Tang LX*. A population-based variable neighborhood search for the single machine total weighted tardiness problem, Computers & Operations Research, 2009, 36(6): 2105-2110. (中科院二区, JCR 1区).
- [64] Tang LX*, Wang XP*. Simultaneously scheduling multiple turns for steel color-coating production, European Journal of Operational Research, 2009, 198: 715-725. (中科院二区TOP, JCR 1区).
- [65] Wang XP, Tang LX*. A tabu search heuristic for the hybrid flowshop scheduling with finite intermediate buffers, Computers & Operations Research, 2009, 36(3): 907-918. (中科院二区, JCR 1区).
- [66] Tang LX*, Wang XP. Color-coating production scheduling for coils in inventory in steel industry, IEEE Transactions on Automation Science and Engineering, 2008, 5(3): 544-549. (中科院二区TOP).
- [67] Tang LX*, Wang XP. A predictive reactive scheduling method for color-coating production in steel industry, International Journal of Advanced Manufacturing Technology, 2008, 35: 633-645. (JCR 2区).
- [68] Tang LX*, Wang XP. An iterated local search heuristic for the capacitated prize-collecting traveling salesman problem, Journal of the Operational Research Society, 2008, 59(5): 590-599. (JCR 2区).
- [69] Wang XP, Tang LX*. Integration of batching and scheduling for hot rolling production in steel industry, International Journal of Advanced Manufacturing Technology, 2008, 36: 431-441. (JCR 2区).
- [70] Tang LX*, Wang XP. Iterated local search algorithm based on very large-scale neighborhood for prize-collecting vehicle routing problem, International Journal of Advanced Manufacturing Technology, 2006, 29: 1246-1258. (JCR 2区).